View the progress of the swimming pool construction.
First a large crane was moved in to clear a path for construction equipment.

Hardcore was brought in to make a pathway to the old damaged pool site.
Then a JCB was used to demolish the old building.

The JCB made quick work of the old charred wooden building.
Click here to see a video of the JCB in action

The old pool was covered to prevent damage. This is all that is left.

The foundations are excavated with a jcb and then filled with concrete.


The foundations are nearly finished.

A truck arrives to deliver the support beams.
The foundations are complete. Ready for the bricklayers. 23/01/2006
The roof framework is formed ready to be hoisted into postion.

A scaffolding is built to support the roof while the walls are built underneeth.

The scaffolding is ready to accept the roof.
A crane is brought in to Lift the first roof section into place.
The walls are shooting up now. The window and door frames are in place.
Construction continues through the holidays. Everything begins to take shape.
The outside shell of the pool is nearly complete!